
Strap MIM Parts
Zhongwei Precision Co., Ltd. and Central South University have a R&D team of 10 people. They develop more than 400 products each year, which is more than 68% higher than the same industry, and have obtained more than 20 patent certificates.
Product Introduction
Strap MIM Parts | |||||||||
Item | Material | Production Process | Sintering Temperature | Mold | Custom | ||||
Strap grain | Titanium alloy | Metal Injection Molding | 1350°C | To be customized | Yes | ||||
Available Materials | Low carbon stainless steel, titanium alloy (Ti, TC4), copper alloy, tungsten alloy, hard alloy, high temperature alloy (718, 713) | ||||||||
Finish | Dimensional Accuracy | Product Density | Appearance Treatment | Appropriate Weight | |||||
Roughness 1~5μm | (±0.1%~±0.5%) | 92~95% | Mirror Reflection | 0.03g~400g) | |||||
Standard performance | Standard performance (O≤0.3%, N≤0.007%, σ=451617MPa, σ0.2≥343MPa, δ≥18%). | ||||||||
Metal Injection Molding Process

Our Service
Pre-sale | Evaluate according to drawings or products, calculate the price, and submit it to the buyer for confirmation |
On sale | The production process of all products is supported by the production system and delivered according to the mutually agreed time. (If the size of the drawing needs to be changed in the middle, the buyer is responsible for the inconsistency with the original drawing. If we fail to meet customer requirements during the modification process, a full refund will be given) |
After sales | After handing over the product, we will seal all the buyer's molds for safekeeping. (Problem solving) If there is a second or third revision in the production process, we will reply within 1 hour at the earliest, and we will solve customer problems within 8 hours at the latest depending on the situation of products that need to be evaluated. |
Why Choose US?
Our R&D team | Zhongwei Precision Co., Ltd. and Central South University have a R&D team of 10 people. They develop more than 400 products each year, which is more than 68% higher than the same industry, and have obtained more than 20 patent certificates. |
Our technical team | Zhongwei Precision has 5 professional engineers in the field of metal injection molding, and 15 technicians responsible for workshop management. |
Our philosophy on quality management | 1. Focus on the customer |
Device resources | The company has 10 MIM production lines, CNC and intelligent automated production workshops for production lines, which can guarantee the production of millions of MIM parts per day. |
System Certification | ISO9001, ISO14001, IATF16949 certification |
| Port | It is 200 kilometers away from Tianjin Port, and goods can arrive at the port within 24 hours. |

Process After Sintering
1. Heat treatment: annealing, carbonization, tempering, quenching, normalizing, surface tempering
2. Processing equipment: CNC, WEDM, lathe, milling machine, drilling machine, grinder, etc.;
3. Surface treatment: anodizing, powder spraying, chrome plating, painting, sandblasting, nickel plating, galvanizing, blackening, polishing, bluing, etc.
Moulds and Inspection Fixtures
1. Mold service life: usually semi-permanent. (except for lost foam)
2. Mold delivery time: 10-25 days, (according to product structure and product size).
3. Tooling and mold maintenance: Zhongwei is responsible for precision parts.
Quality Control
1. Quality control: the defective rate is less than 0.1%.
2. Samples and trial run will be 100% inspected during production and before shipment, sample inspection for mass production according to ISDO standards or customer requirements.
3. Testing equipment: flaw detection, spectrum analyzer, golden image analyzer, three-coordinate measuring machine, hardness testing equipment, tensile testing machine.

Send Inquiry









