Strap MIM Parts
Strap MIM Parts
video
Strap MIM Parts
2a50930995765972a17c4202876dc8d0_001C
5c5e775e97f95b8458d85dc8fe69c68a_001A-2
1/2
<< /span>
>

Strap MIM Parts

Zhongwei Precision Co., Ltd. and Central South University have a R&D team of 10 people. They develop more than 400 products each year, which is more than 68% higher than the same industry, and have obtained more than 20 patent certificates.

Product Introduction

Strap MIM Parts

Item

Material

Production Process

Sintering Temperature

Mold

Custom


Strap grain

Titanium alloy

Metal Injection Molding

1350°C

To be customized

Yes


Available Materials

Low carbon stainless steel, titanium alloy (Ti, TC4), copper alloy, tungsten alloy, hard alloy, high temperature alloy (718, 713)

Finish

Dimensional Accuracy

Product Density

Appearance Treatment

Appropriate Weight

Roughness 1~5μm

(±0.1%~±0.5%)

92~95%

Mirror Reflection

0.03g~400g)

Standard performance

Standard performance (O≤0.3%, N≤0.007%, σ=451617MPa, σ0.2≥343MPa, δ≥18%).


Metal Injection Molding Process

image007


Our Service

Pre-sale

Evaluate according to drawings or products, calculate the price, and submit it to the buyer for confirmation

On sale

The production process of all products is supported by the production system and delivered according to the mutually agreed time. (If the size of the drawing needs to be changed in the middle, the buyer is responsible for the inconsistency with the original drawing. If we fail to meet customer requirements during the modification process, a full refund will be given)

After sales

After handing over the product, we will seal all the buyer's molds for safekeeping.

(Problem solving) If there is a second or third revision in the production process, we will reply within 1 hour at the earliest, and we will solve customer problems within 8 hours at the latest depending on the situation of products that need to be evaluated.


Why Choose US?

Our R&D team

Zhongwei Precision Co., Ltd. and Central South University have a R&D team of 10 people. They develop more than 400 products each year, which is more than 68% higher than the same industry, and have obtained more than 20 patent certificates.

Our technical team

Zhongwei Precision has 5 professional engineers in the field of metal injection molding, and 15 technicians responsible for workshop management.

Our philosophy on quality management

1. Focus on the customer
Organizations depend on customers, so organizations should understand customers' current and future needs in order to meet customer requirements and exceed their expectations.
2. Leadership
Organizers unify the purpose, direction and internal environment of the organization and create an environment in which employees can fully participate in the achievement of organizational goals. 80% of quality problems are related to management and 20% are related to employees.
3. Full participation
Employees at all levels are the foundation of the organization's survival and development, and only with their full participation can they bring benefits to the organization. Job responsibilities include all staff (from general manager to grassroots staff).
4. Process Approach
Manage related resources and activities as a process to achieve desired results more efficiently. Flowchart method.
5. A systematic approach to management
Identifying, understanding, and managing a system of interrelated processes against set objectives contributes to the effectiveness and efficiency of an organization. The principle of the hoarding of the wooden bucket.
6. Continuous Improvement
It is an eternal development goal of the organization. PDCA cycle.
7. A fact-based approach to decision-making:
Logical analysis or judgment of data and information is the basis for effective decision-making. Speak with data and facts.
8. Mutually beneficial supplier relationships
Enhance the ability of the organization and its suppliers to create value through mutually beneficial relationships.

Device resources

The company has 10 MIM production lines, CNC and intelligent automated production workshops for production lines, which can guarantee the production of millions of MIM parts per day.

System Certification

ISO9001, ISO14001, IATF16949 certification

PortIt is 200 kilometers away from Tianjin Port, and goods can arrive at the port within 24 hours.


image011


Process After Sintering

1. Heat treatment: annealing, carbonization, tempering, quenching, normalizing, surface tempering

2. Processing equipment: CNC, WEDM, lathe, milling machine, drilling machine, grinder, etc.;

3. Surface treatment: anodizing, powder spraying, chrome plating, painting, sandblasting, nickel plating, galvanizing, blackening, polishing, bluing, etc.


Moulds and Inspection Fixtures

1. Mold service life: usually semi-permanent. (except for lost foam)

2. Mold delivery time: 10-25 days, (according to product structure and product size).

3. Tooling and mold maintenance: Zhongwei is responsible for precision parts.


Quality Control

1. Quality control: the defective rate is less than 0.1%.

2. Samples and trial run will be 100% inspected during production and before shipment, sample inspection for mass production according to ISDO standards or customer requirements.

3. Testing equipment: flaw detection, spectrum analyzer, golden image analyzer, three-coordinate measuring machine, hardness testing equipment, tensile testing machine.


image009


Send Inquiry

(0/10)

clearall