Lost Wax Investment Casting Of Oil Circuit Bracket
Lost Wax Investment Casting Of Oil Circuit Bracket
video
Lost Wax Investment Casting Of Oil Circuit Bracket
1653451225_1_-removebg-preview(001)
1653451252_1_-removebg-preview(001)
1/2
<< /span>
>

Lost Wax Investment Casting Of Oil Circuit Bracket

Zhongwei Precision Co., Ltd. and Central South University have a R&D team of 10 people. They develop more than 400 products each year, which is more than 68% higher than the same industry, and have obtained more than 20 patent certificates.

Product Introduction

Lost Wax Investment Casting of Oil Circuit Bracket

Item

Material

Production Process

Sintering Temperature

Mold

Custom

Lost Wax Investment Casting of Oil Circuit Bracket

Customized according to customer requirements

Investment Casting

1680℃

To be customized

Yes

Available Materials

Carbon steel, alloy steel, aluminum alloy, low carbon stainless steel, titanium alloy (Ti, TC4), copper alloy, high temperature alloy (718, 713)

Smoothness

Dimensional accuracy

Product density

Appearance treatment

Appropriate weight

Roughness 1~5μm

(±0.1%~±0.5%)

7.8g/CM³

According to customer requirements

3g~4kg)

 

Why Choose US?

Our R&D team

Zhongwei Precision Co., Ltd. and Central South University have a R&D team of 10 people. They develop more than 400 products each year, which is more than 68% higher than the same industry, and have obtained more than 20 patent certificates.

Our technical team

Zhongwei Precision has 5 professional engineers in the field of metal injection molding, and 15 technicians responsible for workshop management.

Our philosophy on quality management

1. Focus on the customer

Organizations depend on customers, so organizations should understand customers' current and future needs in order to meet customer requirements and exceed their expectations.

2. Leadership

Organizers unify the purpose, direction and internal environment of the organization and create an environment in which employees can fully participate in the achievement of organizational goals. 80% of quality problems are related to management and 20% are related to employees.

3. Full participation

Employees at all levels are the foundation of the organization's survival and development, and only with their full participation can they bring benefits to the organization. Job responsibilities include all staff (from general manager to grassroots staff).

4. Process Approach

Manage related resources and activities as a process to achieve desired results more efficiently. Flowchart method.

5. A systematic approach to management

Identifying, understanding, and managing a system of interrelated processes against set objectives contributes to the effectiveness and efficiency of an organization. The principle of the hoarding of the wooden bucket.

6. Continuous Improvement

It is an eternal development goal of the organization. PDCA cycle.

7. A fact-based approach to decision-making:

Logical analysis or judgment of data and information is the basis for effective decision-making. Speak with data and facts.

8. Mutually beneficial supplier relationships

Enhance the ability of the organization and its suppliers to create value through mutually beneficial relationships.

Device resources

The company has 10 MIM production lines, CNC and intelligent automated production workshops for production lines, which can guarantee the production of millions of MIM parts per day.

System Certification

ISO9001, ISO14001, IATF16949 certification

Port

It is 200 kilometers away from Tianjin Port, and goods can arrive at the port within 24 hours.

 

Process after sintering

1. Heat treatment: annealing, carbonization, tempering, quenching, normalizing, surface tempering

2. Processing equipment: CNC, WEDM, lathe, milling machine, drilling machine, grinder, etc.;

3. Surface treatment: anodizing, powder spraying, chrome plating, painting, sandblasting, nickel plating, galvanizing, blackening, polishing, bluing, etc.

 

Moulds and Inspection Fixtures

1. Mold service life: usually semi-permanent. (except for lost foam)

2. Mold delivery time: 10-25 days, (according to product structure and product size).

3. Tooling and mold maintenance: Zhongwei is responsible for precision parts.

 

Quality Control

1. Quality control: the defective rate is less than 0.1%.

2. Samples and trial run will be 100% inspected during production and before shipment, sample inspection for mass production according to ISDO standards or customer requirements

3. Testing equipment: flaw detection, spectrum analyzer, golden image analyzer, three-coordinate measuring machine, hardness testing equipment, tensile testing machine;

 

Detection Systems

 

product-600-694

 

Copper Silica Sol Investment Casting

 

product-600-450

product-600-450

 

Send Inquiry

(0/10)

clearall