Titanium Powder Metal Injection Molded 2 Piece Golf Head MIM Par
Titanium Powder Metal Injection Molded 2 Piece Golf Head MIM Par
video
Titanium Powder Metal Injection Molded 2 Piece Golf Head MIM Par
Titanium_powder_metal_injection_molded_2_piece_golf_head_MIM_part_1716363303743_1.jpg_w720
Titanium_powder_metal_injection_molded_2_piece_golf_head_MIM_part_1716363303743_2.jpg_w720
1/2
<< /span>
>

Titanium Powder Metal Injection Molded 2 Piece Golf Head MIM Par

Anodizing, powder coating, chrome plating, spray painting, sandblasting, nickel plating, galvanizing, blackening, polishing, bluening, etc.

product-599-223

 

Step 1: Use iron powder and titanium powder to granulate. Add titanium powder, iron powder, grease release agent and resin adhesive to the mixer, stir and granulate evenly. The proportion of iron powder, release agent and adhesive added is: 90% iron powder, 10% release agent and adhesive.

Step 2: The stirred iron powder is injected into the injection molding machine for injection molding.

Step 3: Put the formed preliminary embryo into the temperature control box for low-temperature preheating and shaping, and set its temperature to 170°C.

Step 4: Put the shaped preliminary embryo into a high-temperature furnace for high-temperature sintering and molding. The temperature is set to 1200°C.

 

Post-sintering Process

1. Heat treatment: annealing, carburizing, tempering, quenching, normalizing, surface tempering

2. Processing equipment: CNC, wire cutting, lathes, milling machines, drilling machines, grinders, etc.;

3. Surface treatment: anodizing, powder coating, chrome plating, spray painting, sandblasting, nickel plating, galvanizing, blackening, polishing, bluening, etc.

 

Molds And Inspection Tools

1. Mold service life: usually semi-permanent. (Except for lost foam)

2. Mold delivery time: 10-25 days, (depending on product structure and product size).

3. Tooling and mold maintenance: Zhongwei is responsible for precision parts.

 

QC

1. Quality control: defective rate is less than 0.1%.

2. Samples and trial runs will be 100% inspected during the production process and before shipment, and sample inspection for mass production is carried out according to ISDO standards or customer requirements.

3. Testing equipment: flaw detection, spectrum analyzer, metallographic analyzer, coordinate measuring machine, hardness testing equipment, tensile testing machine.

 

Qinhuangdao Zhongwei Precision Mechanical Parts Co., Ltd. specializes in the research, development and application of metal injection molding technology, and mass-produces metal parts with high density, high strength and complex three-dimensional shapes.

 

The company has advanced technology and consists of many experts who have been engaged in the metal injection molding industry for a long time, building an efficient team integrating R&D, design, manufacturing and service.

The company is well-equipped with a full set of metal injection molding production and testing equipment to provide customers with excellent quality, on-time delivery and highly competitive prices and services.

The company is located in Qinhuangdao Economic Development Zone, with a good industrial environment and convenient transportation, with direct access to high-speed rail and highways. It is less than two hours drive from Tianjin, Beijing and surrounding cities.

The company is committed to becoming a high-quality modern manufacturing enterprise that is guided by market demand and responds quickly to customer needs.

 

Send Inquiry

(0/10)

clearall