Belt Buckle MIM Parts
• Tensile strength (Mpa) 620 MIN
• Yield strength (Mpa) 310 MIN
• Elongation (%) 30 MIN
• Area reduction (%) 40 MIN
Product Introduction
Belt Buckle MIM Parts | |||||||||
Item | Material | Production Process | Sintering Temperature | Mold | Custom | ||||
Belt Buckle | 316 | Metal Injection Molding | 1350°C-1500°C | To be customized | Yes | ||||
Chemical Composition | C :≤0.08 | ||||||||
Available Materials | Low carbon stainless steel, titanium alloy (Ti, TC4), copper alloy, tungsten alloy, hard alloy, high temperature alloy (718, 713) | ||||||||
Finish | Dimensional Accuracy | Product Density | Appearance Treatment | Appropriate Weight | |||||
Roughness 1~5μm | (±0.1%~±0.5%) | 92~95% | Mirror Reflection | 0.03g~400g) | |||||
Mechanical behavior | • Tensile strength (Mpa) 620 MIN | ||||||||
Belt buckle joint process and standards
1. The belt buckle (belt buckle) used for the belt joint must match the thickness of the belt.
2. The belt interface must be perpendicular to the center line of the belt to prevent accidents caused by deviation and tearing of the belt during belt transportation.
3. A belt buckle of the same type must be used on a belt joint. The holes where the belt buckle hook clips are hooked into the belt should be arranged in a straight line and parallel to the belt cutout to prevent the interface from becoming a trapezoidal shape and causing the belt to deviate.
4. According to the structure of different models, choose the best position for making Belt Buckle MIM Parts joints, and turn this position to the ideal location for making heads when the machine is shut down. Its principles are:
(1) Make cuts at the original joints to shrink or lengthen the tape as much as possible to avoid too many joints on the entire conveyor belt, which will affect the tensile strength of the tape.
(2) The jointing of the retractable belt conveyor must be carried out in the middle of the frame of the belt take-up and release device, and the incision can only be made on the empty belt, and it is not allowed to open on the carrier belt, so as to use the special clamp on the frame Two swivel levers for tightening the tape ensure safe work.
(3) The hanging or imitation hanging belt conveyor (that is, the modified type without a belt storage device) must be tensioned close to the machine head frame, and the rear opening of the mechanism should be used as the head, and the head can only be opened at the back of the machine. Empty with openings so that the tape can be fixed with a self-made clamp so that it does not shift.
(4) In abnormal situations, such as the tape joint is torn and the tape is broken, it can only be solved on the spot, but safety measures must be formulated to ensure safety.
Joint process procedure:
(1) Transfer the selected head position to the ideal head lot.
(2) Cut off the power supply of the main engine, lock its switch and lock screw, hang the work sign of "someone is working, no power transmission", and instruct the belt driver to take special care of it, and no one is allowed to transmit power for any reason, otherwise the belt driver will take full responsibility .
(3) At the opening of the pre-selected belt, lay tools on the side of the pre-selected belt (when taking in) or both sides (when extending the belt) or tighten the screw, then remove the original belt buckle pin, and check Whether the original belt buckle can continue to be used, if the damage strength decreases or the original buckle is unqualified, the original buckle must be cut off according to the second requirement above and a new head must be made.
(4) When re-making the head, the incision of the belt must be neat and there must be no tearing. If it cannot be formed at one time, it must be trimmed. Then use a special steel template to nail the prepared belt buckle into the belt interface. When the belt shrinks, only one end needs to be nailed (both ends must be nailed when the belt is stretched), and one end must be connected with the newly added tape head. .
(5) Use the tensioning device to loosen the tape, then shorten or extend the fuselage to a predetermined length according to the predetermined plan, and recycle or lengthen the tape while shortening or extending the fuselage. If it is a retractable model, the belt storage device The tape must be exhausted or basically full of tape. Regardless of the model, after the tape is retracted, the two ends to be connected must be in the overlapping position.
(6) If it is an elongated tape, at this time, the other end of the newly added tape must be nailed to the headband buckle according to the above method. After the belt buckle is nailed on both ends of the tape, butt the two ends, penetrate the pin shaft, and lock the pin shaft head to prevent it from being pulled together. At this point, the belt joint is basically completed.
(7) After the joint is connected, remove the belt clamp or unscrew the rotary rod.
(8) Use the tensioning device to tighten the belt, and check whether the belt is deviated. If there is a partial deviation, use the anti-deviation device to adjust it.
(9) After careful and repeated inspections, all tools, appliances, materials and staff are evacuated from the scene, and the driver can start the test run after the substitute squad leader removes the blackout sign.
(10) Dealing with belt deviation.
Metal Injection Molding Process